Records finishing the T14 state-dependent pipelines (pulumi-preview +
backup-verify, green on the runner) and the ecosystem CI: the composite-action
reuse layer (Forgejo 11 has no reusable workflows), the semantic-release bump
sequence + eslint/yamllint gates, and candidate coverage (C2/C3/C4 validated;
C1/C5 blocked on the unpublished package registry). Refreshes HANDOVER to the
new state + next steps, and tracks the operator's now-implemented 999_testing plan.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Sharpen the living handover for the next context: concrete starting points +
pre-surfaced blockers/decisions for (1) the stack-state-dependent CI pipelines
(state-fetch-from-RustFS + Forgejo Actions secrets) and (2) the 999_testing
ecosystem CI (reusable workflows, build matrix over the 5 candidates,
semantic-release bump tests, eslint/yamllint, R5 runner-fencing first).
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Record the session: all three known gaps closed (age encryption, Forgejo
crypto mirror + empty-SECRET_KEY fix, ipam ignoreChanges), T11 (repos → Forgejo,
origin switched), T13 (DR rehearsed on a throwaway VM + scripts + runbook), and
T14 core (baked CI image + runner config + green preflight/typecheck workflow).
Refresh HANDOVER to point at it; next: state-dependent CI + ecosystem CI
(999_testing.md) + T15 + hardening.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Self-contained prompt for a fresh Lead Agent context: required reads (incl. ADR-007),
current live state, operating essentials (run.sh / vault-unseal / backup), HIGH-RISK
watchouts (the refresh ipam diff), and the remaining PLAN-002 task order.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Data plane (postgres/rustfs/vault) → creds-in-Vault → Caddy DNS-01 → Forgejo →
admin/org/repo → runner → backup, all deployed live and validated. The goal is met:
git clone git@git.olsitec.net:olsitec/foundation.git works. Records state, the
ADR-007 control-plane mechanism, known gaps (age encryption, refresh ipam diff), and
the remaining PLAN-002 tasks (T11/T13/T14/T15).
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Repo topology, baseline overlay, planning docs (PLAN-001/002), ADR-004/005,
and the bootstrap/packages/documentation skeleton. Implementation (T00+) not started.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>